Illustrative engineer reviewing the load schedule beside closed UPS equipment
Illustrative application planning scene. Not a customer installation.

What the 1 MW reference tells a buyer

RAPSTECH management reports a largest completed installation of 1 MW. That establishes a company-reported scale reference. It does not identify the end customer, number of systems, installed kVA, redundancy configuration or battery runtime. Those details require project records. A new project should begin with its own engineering requirement rather than copy an undisclosed configuration.

The critical load schedule

Record each protected system, its operating demand and the dependencies it needs to stay available. Confirm whether values represent actual measurements, manufacturer data or design assumptions. Define the growth allowance with the load owner. Capacity selection must consider both kW and kVA limits, operating behaviour and the required input/output phase arrangement.

Capacity and redundancy need separate decisions

A modular platform may support expansion, but the populated modules and the redundancy objective determine the available output. State what must remain powered if a module or system becomes unavailable. The modular UPS selection guide explains why chassis capacity, installed power and backup duration answer different questions.

Battery runtime and generator coordination

Define whether batteries must bridge source changeover, support a controlled shutdown or maintain operation for a specified duration. Battery selection depends on the connected load, discharge conditions and the chosen UPS. Review generator input compatibility and transfer behaviour as part of the project design. Grid-tied solar alone should not be treated as an outage backup source.

Installation readiness and acceptance

Before ordering, agree access routes, floor loading, ventilation, electrical protection, earthing, isolation and maintenance clearances. Assign responsibilities for cables, civil work and distribution interfaces. The commissioning plan should identify inspections, functional checks, acceptance criteria and the documents required at handover. Use the installation and commissioning service page to prepare the discussion.

A quotation that is easier to compare

Request a documented configuration, battery basis, installation boundaries, exclusions and service terms. Avoid comparing an equipment-only offer with a complete installation proposal. Share the site location, load schedule, intended runtime and project date through the RAPSTECH enquiry form. Ask for a reference with comparable scope rather than assuming that the largest historical installation represents every offered product.

HYDERABAD HEADQUARTERS · TWIN-CITY SERVICE & REGIONAL COVERAGE

Hyderabad & Secunderabad. At the heart of RAPSTECH.

From our Hyderabad headquarters in Begumpet, we coordinate UPS systems, batteries, inverter solutions and AMC for Secunderabad and Hyderabad, with service coverage in Visakhapatnam (Vizag) and Vijayawada.

Share your site, load and backup objective to plan supply, installation and ongoing support with our headquarters team.

View headquarters & service areas →   Contact RAPSTECH →